King's School,
Hext Design.
project type.
3D Visualisation
As part of a commercial project the client set a brief for to best utilise the space for a School project, which required both a 2D plan and 3D visuals of the space.
The canteen would have been a part of a new build of the schools campus. The canteen would have to be multi functional, required to be used either as it’s primary function of a visitor’s canteen or it’s secondary function of School/social functions, which requires the tables to be removed or re-positioned. After confirming the space plan with the client a 3D was produced from reference images and brief details.
The final model was mostly generated in house including the bespoke deep button banquette seating. Software used was Rhino 3D with Vray for Rhino as the renderer.
This project was part of a body of work at Inside Out Contracts.





